[1]
2025. 3D Modeling Techniques and Applications of Geological Cross-Section Maps: A Case Study of the Shimen Interconnecting Pipeline Tunnel. Asian Journal of Engineering Geology. 2, Sp Issue (Nov. 2025), 155–156. DOI:https://doi.org/10.64862/.