[1]
2026. Discrepancies Between Predicted and Actual Rock Mass Conditions in Himalayan Tunnelling: Insights from the Upper Trishuli 3B Project, Nepal. Asian Journal of Engineering Geology. 3, Sp Issue (Oct. 2026), 51–52. DOI:https://doi.org/10.64862/.