Geotechnical Challenges and Adaptive Solutions in the Nagdhunga Tunnel Construction Project. (2025). Asian Journal of Engineering Geology, 2(Sp Issue), 153-154. https://doi.org/10.64862/ajeg.2025.2sp.71.195