“Discrepancies Between Predicted and Actual Rock Mass Conditions in Himalayan Tunnelling: Insights from the Upper Trishuli 3B Project, Nepal”. 2026. Asian Journal of Engineering Geology 3 (Sp Issue): 51-52. https://doi.org/10.64862/.