“Discrepancies Between Predicted and Actual Rock Mass Conditions in Himalayan Tunnelling: Insights from the Upper Trishuli 3B Project, Nepal” (2026) Asian Journal of Engineering Geology, 3(Sp Issue), pp. 51–52. doi:10.64862/.