[1]
“Discrepancies Between Predicted and Actual Rock Mass Conditions in Himalayan Tunnelling: Insights from the Upper Trishuli 3B Project, Nepal”, AJEG, vol. 3, no. Sp Issue, pp. 51–52, Oct. 2026, doi: 10.64862/.