1.
Tunnel Excavation and Support in Exceptionally Poor Rock Mass (Shear Zone) Condition in Lesser Himalaya, Nepal: Case Study of Upper Kabeli Hydropower Project (28.1 Mw), Taplejung Nepal. AJEG [Internet]. 2025 Nov. 27 [cited 2025 Dec. 12];2(Sp Issue):353-4. Available from: https://ajeg.nseg.org.np/index.php/ajeg/article/view/242