Preliminary Study on the Pipeline Buckling Under Thrust Faulting Using the Coupled DEM-FDM Method. Asian Journal of Engineering Geology, [S. l.], v. 2, n. Sp Issue, p. 287–288, 2025. DOI: 10.64862/. Disponível em: https://ajeg.nseg.org.np/index.php/ajeg/article/view/210.. Acesso em: 12 dec. 2025.